Sunday, November 25, 2012

Cutting seat

Cut out the foot brace pieces and the rowing seat. Still do not have enough space in the basement so I had to take the workshop outside, a bit cold but at least above freezing.

Getting started

All done, next stop is glue (next week?)

Did not have time for much more since the kids found a dead fish on the beach and I was needed for the funeral.......

Time today: 30 min

Monday, November 19, 2012

Back to the boat

Back to doing some "building" again, even tough the pace will be slower this winter it is nice to focus a little on the boat again. Started to work on the loose pieces for rowing; the seat and the foot support.

The sketch

The templates

Drawn up and ready for cutting

The cutting will have to wait until next weekend as I am off on another trip tomorrow.

Time on Sunday: 1h

Saturday, November 17, 2012

Göteborg

Spent the week in Gothenburg.

View of the river. The barque have been on the blog before.

Nothing new have happened with the boat, still too many boxes in the basement to start working on the masts. I hope to get going on the rowing seat etc next week.