Saturday, December 1, 2012
First snow
We had the first snow of the season this week. After the weekend apparently it is supposed to get real cold so there may be more.
Sunday, November 25, 2012
Cutting seat
Cut out the foot brace pieces and the rowing seat. Still do not have enough space in the basement so I had to take the workshop outside, a bit cold but at least above freezing.
Did not have time for much more since the kids found a dead fish on the beach and I was needed for the funeral.......
Time today: 30 min
Getting started
All done, next stop is glue (next week?)
Time today: 30 min
Monday, November 19, 2012
Back to the boat
Back to doing some "building" again, even tough the pace will be slower this winter it is nice to focus a little on the boat again. Started to work on the loose pieces for rowing; the seat and the foot support.
The cutting will have to wait until next weekend as I am off on another trip tomorrow.
Time on Sunday: 1h
The sketch
The templates
Drawn up and ready for cutting
Time on Sunday: 1h
Saturday, November 17, 2012
Wednesday, October 31, 2012
Getting ready for winter
Prepped the boat for winter. I bought a new big tarp instead of the two old small crappy once. Quite a lot of water had leaked in the joint despite a 40 cm overlap.
So we cleaned the boat and got the new tarp on. Added some more wood to support the tarp (avoiding water puddles) and provide ventilation openings.
Ended the day by carving the first pumpkin in my life!
Crew hard at work
So we cleaned the boat and got the new tarp on. Added some more wood to support the tarp (avoiding water puddles) and provide ventilation openings.
After a job well done!
Ended the day by carving the first pumpkin in my life!
HAPPY HALLOWEEN!!!!!
Sunday, October 14, 2012
Material costs
Thought I should look into the material costs today.
I ordered the frame kit from Fyne, something that shortened my building time but increased the cost. Another thing that drastically could have saved me some money was the Epoxy. I started out buying West Epoxy which is hard to find and very expensive in Poland, eventually I found a local manufacturer LaminoPol which had a very nice product at a third of the West price..... So had I gone local from the start I would have saved almost 300Euro!!!
So these where the main parts of the material cost:
Plywood: 300Euro (I bought too much as I did not need ply for the frames)
Frame kit: 710Euro
Solid wood: 660Euro (ready cut and planed to the right dimensions)
Epoxy: 680Euro (still have around 4 liters left which will be plenty for he remaining jobs)
Paint: 150Euro
So a grand total of: 2500Euro or about 3200USD
I am happy this was spread out over almost a whole year!
I ordered the frame kit from Fyne, something that shortened my building time but increased the cost. Another thing that drastically could have saved me some money was the Epoxy. I started out buying West Epoxy which is hard to find and very expensive in Poland, eventually I found a local manufacturer LaminoPol which had a very nice product at a third of the West price..... So had I gone local from the start I would have saved almost 300Euro!!!
So these where the main parts of the material cost:
Plywood: 300Euro (I bought too much as I did not need ply for the frames)
Frame kit: 710Euro
Solid wood: 660Euro (ready cut and planed to the right dimensions)
Epoxy: 680Euro (still have around 4 liters left which will be plenty for he remaining jobs)
Paint: 150Euro
So a grand total of: 2500Euro or about 3200USD
I am happy this was spread out over almost a whole year!
Monday, October 1, 2012
The vikings are coming
Went to a Viking fair organized by the local viking society, Alsnu. The weather was crap but the kids got to bake bread, shoot bow & arrow and listen to Aesir stories, I focused on the boats. I actually forgot to take pictures of anything else...